Rehabilitation of 3 bridges on STH 80 North of Richland Center
8-52-0047 over Horse Creek
- Just south of CTH A intersection
- Concrete overlay of bridge deck, replace guardrail, and asphalt overlay bridge approaches
- STH 80 to remain open (with the exception of the 10-day closure listed for B-52-269) utilizing half at a time construction with temporary signals
B-52-0048 over Melancthon Creek
- Approximately 1000 feet North of CTH C
- Concrete overlay of bridge deck, replace guardrail, and asphalt overlay bridge approaches
- STH 80 to remain open TO LOCAL TRAFFIC ONLY utilizing half at a time construction with temporary stop signs
8-52-0049 over Melancthon Creek
- Approximately 2000 feet North of CTH C
- Asphalt overlay of bridge deck, replace guardrail, and asphalt overlay bridge approaches
- STH 80 to remain open TO LOCAL TRAFFIC ONLY utilizing half at a time construction with temporary stop signs
The Project Manager (contact person) is Dan Kleinertz, P.E. 608-789-5709