Project overview

The Wisconsin Department of Transportation (WisDOT) is developing preliminary plans for a resurfacing project on WIS 58. The 6.73-mile long project begins in the Village of Cazenovia and heads northeast to the Village of La Valle.

Proposed improvements:

  • Mill and overlay existing pavement
  • Update curb ramps as needed to meet American with Disabilities Act (ADA) requirements
  • Replace guardrail and install energy absorbing terminals (EATs)
  • Widen paved shoulders from 1-foot to 3-foot

Public involvement

December 2020 – Virtual Public Involvement Meeting (PIM) #1​​​

 
  • Meeting presentation
  • Meeting handout
  • Downloadable comment form

Schedule

  • Spring 2021 – Public involvement meeting (PIM) #1
  • 2026 – Construction anticipated

Status/phase

Design

Contact information

David Schmidt, P.E.
WisDOT Project Manager
608-246-3867
david2.schmidt@dot.wi.gov

Michael Bie
WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
Fax: (608) 246-3843
TTY: 711
Email: swr.dtsd@dot.wi.gov

Filed Under: General, Projects

General Information

Josh Elder, Highway Commissioner

Office: 608-647-4707
Shop: 608-647-2208
Fax: 608-647-3231

Office Location

Richland County Highway Department
120 Bowen Circle
Richland Center, WI 53581

Important Links

National Weather Service
Wisconsin Travel Info
WRCO Radio

Copyright © 2025 Richland County Highway Department   All Rights Reserved.
Richland County, Wisconsin