Project overview
The Wisconsin Department of Transportation (WisDOT) is developing preliminary plans for a resurfacing project on WIS 58. The 6.73-mile long project begins in the Village of Cazenovia and heads northeast to the Village of La Valle.
Proposed improvements:
- Mill and overlay existing pavement
- Update curb ramps as needed to meet American with Disabilities Act (ADA) requirements
- Replace guardrail and install energy absorbing terminals (EATs)
- Widen paved shoulders from 1-foot to 3-foot
Public involvement
December 2020 – Virtual Public Involvement Meeting (PIM) #1
Schedule
- Spring 2021 – Public involvement meeting (PIM) #1
- 2026 – Construction anticipated
Status/phase
Design
Contact information
David Schmidt, P.E.
WisDOT Project Manager
608-246-3867
david2.schmidt@dot.wi.gov
Michael Bie
WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov
Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright Street
Madison, WI 53704
Phone: (608) 246-3800
Fax: (608) 246-3843
TTY: 711
Email: swr.dtsd@dot.wi.gov