The Richland County Highway Shop was constructed in 1994. The facility consists of:
Main Garage & Offices
- 36,700 square feet
- Storage of 15 trucks with Wash Bay
- Parts Storage & Mezzanine Storage
- Three-bay Repair Access
- Five-ton Overhead Bridge Crane
- Welding Shop with Isolated Exhaust System
- Lunch Room, Locker Room & Conference/Training Room
- Administrative Offices
Truck Scale
- 50 Ton Capacity
- Lever Weighing System Below Platform
- Remote Monitoring from Administration Office
Waste Oil Recovery
- 1,000 Gallon Waste Oil Collection System
- Empty Container Storage
- Spill Containment Sump
Self-Contained Salt Storage Facility
- Salt Storage for 5,000 Tons of Salt
- Shared facility with WisDOT
- 30′ Doors allow Trucks to unload inside building
- Lean-to canopy for Summer storage of Sand Spreaders
Above Ground Fuel Dispensing System
- Two 8,000 Gallon diesel fuel tanks
- One 1,000 Gallon unleaded fuel tank
- Self contained design with spill sump
- Designed for future monitoring from Administration office
Yard and Unheated Storage
- Tire Storage
- Sign Shop
- Master Plan for future growth