Richland County Highway Department

Richland County, WI

  • Facility
  • Staff
  • Jobs
  • Projects
  • FAQs
  • Committee Meetings
    • Committee Minutes
  • History
  • Contact

2021 – Proposed Road Work Schedule

February 11, 2021 By John Couey

Download a Printable PDF

2021 Highway Road Work Schedule Map

State

STH 80 – Mill and overlay from CTH RC to the Wisconsin River
STH 171 – Culvert replacement
Washing and sealing various bridges

County

CTH U – Pulverize and repave from Vernon County line south 1.5 miles.
County Sealcoat (proposed) and various pavement repairs

  • CTH A – 4.86 miles – from STH 80 to CTH ZZ
  • CTH AA – 4.86 miles – from STH 80 to city limit
  • CTH CC – 5.08 miles – from STH 80 to CTH V
  • CTH G – 2.33 miles – from STH 14 to CTH E
  • CTH RC – 2.33 miles – from STH 80 to CTH O
  • CTH TB – 4.5 miles – from CTH O to Thompson Ln
  • CTH U – 1.77 miles – from CTH E to Wicks Way
  • CTH V – 1.26 miles – from STH 58 to German Town

Culvert replacement and ditching in various locations.
Crack Sealing various County roads

Township

  • Eagle – Seal coat Basswood Rd
  • Marshall – Seal Coat Berry Hill Rd

2021 Seal Coat Schedule and Materials PDF

Filed Under: Projects

General Information

Josh Elder, Highway Commissioner

Office: 608-647-4707
Shop: 608-647-2208
Fax: 608-647-3231

Office Location

Richland County Highway Department
120 Bowen Circle
Richland Center, WI 53581

Important Links

National Weather Service
Wisconsin Travel Info
WRCO Radio

Copyright © 2025 Richland County Highway Department   All Rights Reserved.
Richland County, Wisconsin