2020 – Proposed Roadwork Schedule

January 27, 2020 By John Couey

Download a Printable PDF

6 Year Plan

State

STH 56 – From Hwy 80 to Camp Creek Bridge, replace culverts and extensions, extend concrete box culverts, widening of highway, mill and repave
STH 130 – South of Lone Rock all 3 steel truss bridges will be repaired
USH 14 and STH 130 – At Lone Rock will have the intersection reconstructed
USH 14 – from Richland Center to Boaz will get route and sealed
Washing and sealing of various bridges

County

CTH Y – Slope work, pulverize and repave
CTH V, G, H – Wedging and seal coating
Crack sealing on various county roads

Township

TRIP projects
Bloom – Spangler Ridge Rd culvert replacement and sealcoat
Eagle – Basswood Rd gravel lift, pulverize and seal coat
Henrietta – Century Farm Rd gravel lift and seal coat
Marshall – Berry Hill Rd ditching, gravel lift, culvert replacement and seal coat

Filed Under: Projects

General Information

Josh Elder, Highway Commissioner

Office: 608-647-4707
Shop: 608-647-2208
Fax: 608-647-3231

Current Projects

2021 – Proposed Road Work Schedule

WIS 58 Project (Lee Lake Bridge to WIS 33)

2020 – Proposed Roadwork Schedule

General Information

Spring Roadway Weight Restrictions To Be Lifted April 11, 2022

Spring Roadway Weight Restrictions In Effect March 8th, 2021

WIS 58 Project (Lee Lake Bridge to WIS 33)

Proposed Vehicle Registration Information

Vehicle Registration Fact Sheet

Office Location

Richland County Highway Department
120 Bowen Circle
Richland Center, WI 53581

Important Links

National Weather Service
Wisconsin Travel Info
WRCO Radio

Copyright © 2023 Richland County Highway Department   All Rights Reserved.
Richland County, Wisconsin