2019 – Proposed Roadwork Schedule

March 19, 2019 By John Couey

State

STH 80 – Re-sign Project from Gotham to the Vernon County Line
USH 14 – Route & Seal – from Richland Center to Vernon County Line
STH 131 – Route & Seal – Viola to Vernon County Line
STH 56 – Route & Seal – from Kanable Hollow Road to Viola
Various State Pavement Repairs – (STH 56, 171, 80N, 130) Wedge, rut filling and caps
2019 PBM – Bridge Sealing (contract) Various State Bridges
Culvert Replacements – Large CST & box structure replacements – prior to re-pavement project – STH 56-from STH 80 to Viola
Shoulder Rehab – STH 56 – from STH 80 to CTH H – Core and replace with new gravel, roll and shape 3’ wide shoulder

County

CTH Y – – re-alignment – L & M Salvage. Complete remaining road construction in preparation for paving in 2020
CTH YS – Complete earth work – Drainage and culvert replacement in preparation for paving in 2020
CTH Y – Restore drainage, repair and replace culverts – from Crow Hill Road to CTH Q
County Sealcoat (proposed) and various pavement repairs

  • CTH G – 2.06 miles – from STH 56 to CTH I
  • CTH V – 2.84 miles – from Vernon County Line to CTH CC
  • CTH H – 3.70 miles – from STH 56 to CTH D (Bloom City)
  • CTH BR – 2.63 miles – from STH 80 to STH 80

CTH Maintenance – Pothole repair – Shoulder and road repair work
Mid March through April – weather permitting

Township

Township Bridge replacement

  • Spiral Drive – Ithaca Township
  • Covered Bridge Road – Richland Township

Grading gravel roads – Richland Township
Patching – Richland Township
Mid March through April – weather permitting

Filed Under: Projects

General Information

Josh Elder, Highway Commissioner

Office: 608-647-4707
Shop: 608-647-2208
Fax: 608-647-3231

Current Projects

2021 – Proposed Road Work Schedule

WIS 58 Project (Lee Lake Bridge to WIS 33)

2020 – Proposed Roadwork Schedule

General Information

Spring Roadway Weight Restrictions To Be Lifted April 11, 2022

Spring Roadway Weight Restrictions In Effect March 8th, 2021

WIS 58 Project (Lee Lake Bridge to WIS 33)

Proposed Vehicle Registration Information

Vehicle Registration Fact Sheet

Office Location

Richland County Highway Department
120 Bowen Circle
Richland Center, WI 53581

Important Links

National Weather Service
Wisconsin Travel Info
WRCO Radio

Copyright © 2023 Richland County Highway Department   All Rights Reserved.
Richland County, Wisconsin